Category: 7 E-UTRAN/SAE Test Methods and Design Considerations
- 7.22 EUTRAN RSRQ Calculations
- 7.23 Test method for eICIC and feICIC
- 7.24 Carrier Aggregation Signalling Sequences
- 7.18a RRC Connection Release Sequence for BL/CE UE
- 7.19 DL CCCH Message and Contention Resolution MAC Control Element transmission in one MAC PDU or in separate MAC PDUs
- 7.16 Handover Sequences
- 7.17 Simulation of PDCP MAC-I Failure in UE
- 7.18 RRC Connection Release Sequence
- 7.11 Radio Link Failure
- 7.12 Test method for RRC signalling latency