11.2.4 Packet Cell Change Order
04.603GPPGeneral Packet Radio Service (GPRS)Mobile Station (MS) - Base Station System (BSS) interfaceRadio Link Control / Medium Access Control (RLC/MAC) protocolRelease 1999TS
This message is sent on the PCCCH or PACCH by the network to the mobile station to command the mobile station to leave the current cell and change to a new cell. For a (3G) multi-RAT mobile station the new cell may be a 3G Cell.
Message type: PACKET CELL CHANGE ORDER
Direction: network to mobile station
Classification: non-distribution message
Table 11.2.4.1: PACKET CELL CHANGE ORDER message content
< Packet Cell Change Order message content > ::= < PAGE_MODE : bit (2) > { { 0 < Global TFI : < Global TFI IE > > | 10 < TLLI : bit (32) > } { 0 { < IMMEDIATE_REL : bit > ! < Non-distribution part error : bit (*) = < no string > > } | 1 { 00 — Message escape { < IMMEDIATE_REL : bit > < 3G-target cell: < 3G-target cell struct >> ! < Non-distribution part error : bit (*) = < no string > > } ! < Message escape : { 01 | 10 | 11} bit (*) = <no string> > } } ! < Address information part error : bit (*) = < no string > > } ! < Distribution part error : bit (*) = < no string > > ; |
< GSM target cell struct > ::= < ARFCN : bit (10) > < BSIC : bit (6) > < NC Measurement Parameters : < NC Measurement Parameters struct > > { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in release 98 : { 0 | 1 < LSA Parameters : < LSA Parameters IE >> } { null | 0 bit ** = < no string > — Receiver compatible with earlier release | 1 — Additions in release 99 : < ENH Measurement parameters : < ENH Measurement parameters struct > > < padding bits > } } ; |
< 3G-target cell struct > ::= { 0 | 1 < FDD-ARFCN : bit (14) > — 3G UTRAN FDD < Diversity : bit > { 0 | 1 < Bandwidth_FDD : bit (3) > } < SCRAMBLING_CODE : bit (9) > } { 0 | 1 < TDD-ARFCN : bit (14) > — 3G UTRAN TDD < Diversity : bit > { 0 | 1 < Bandwidth_TDD : bit (3) > } < Cell Parameter : bit (7) > < Sync Case : bit > } < padding bits > ; |
< NC Measurement Parameters struct > ::= < NETWORK_CONTROL_ORDER : bit (2) > { 0 | 1 < NC_NON_DRX_PERIOD : bit (3) > < NC_REPORTING_PERIOD_I : bit (3) > < NC_REPORTING_PERIOD_T : bit (3) > } { 0 | 1 < NC_FREQUENCY_LIST : NC Frequency list struct > } ; |
< NC Frequency list struct > ::= { 0 | 1 < NR_OF_REMOVED_FREQ : bit (5) > { < REMOVED_FREQ_INDEX : bit (6) > } * (1 + val(NR_OF_REMOVED_FREQ)) } { 1 < List of added Frequency : < Add Frequency list struct > >} ** 0; |
< Add Frequency list struct > ::= < START_FREQUENCY : bit (10) > < BSIC : bit (6) > { 0 | 1 < Cell selection params : < Cell Selection struct > > } < NR_OF_FREQUENCIES : bit (5) > < FREQ_DIFF_LENGTH : bit (3) > { < FREQUENCY_DIFF : bit (val(FREQ_DIFF_LENGTH)) > < BSIC : bit (6) > { 0 | 1 < Cell selection params : < Cell Selection struct > > } } * (val(NR_OF_FREQUENCIES)) ; |
< Cell Selection struct > ::= < CELL_BAR_ACCESS_2 : bit (1) > < EXC_ACC : bit > < SAME_RA_AS_SERVING_CELL : bit (1) > { 0 | 1 < GPRS_RXLEV_ACCESS_MIN : bit (6) > < GPRS_MS_TXPWR_MAX_CCH : bit (5) > } { 0 | 1 < GPRS_TEMPORARY_OFFSET : bit (3) > < GPRS_PENALTY_TIME : bit (5) > } { 0 | 1 < GPRS_RESELECT_OFFSET : bit (5) > } { 0 | 1 < HCS params : < HCS struct > > } { 0 | 1 < SI13_PBCCH_LOCATION : < SI13_PBCCH_LOCATION struct > > } ; |
< SI13_PBCCH_LOCATION struct > ::= { 0 < SI13_LOCATION : bit (1) > | 1 < PBCCH_LOCATION : bit (2) > < PSI1_REPEAT_PERIOD : bit (4) > } ; |
< HCS struct > ::= < PRIORITY_CLASS : bit (3) > < HCS_THR : bit (5) > ; |
< ENH Measurement parameters struct > :: = { 0 < BA_IND : bit > < 3G_BA_IND : bit > | 1 < PSI3_CHANGE_MARK : bit(2) > } < PMO_IND : bit > < REPORTING_RATE : bit > { 0 | 1 < GPRS REP PRIORITY Description : < GPRS REP PRIORITY Description struct >> } { 0 | 1 < GPRS MEASUREMENT Parameters Description : < GPRS MEASUREMENT PARAMETERS Description struct >> } { 0 | 1 < GPRS 3G MEASUREMENT Parameters Description : < GPRS 3G MEASUREMENT PARAMETERS Description struct >> } ; |
< 3G Neighbour Cell Description struct > ::= 0 | 1 < Index_Start_3G : bit (7) > } |
< REMOVED_3GCELL_Description struct > ::= < N1 : bit (2) > { < N2 : bit (5) > { < REMOVED_3GCELL_INDEX : bit (7) > < 3GCELL_DIFF : bit (val(3G_CELL_DIFF_LENGTH)) > } * (1+val(N2)) } * (1+val(N1)) ; |
< UTRAN FDD Description struct > ::= { 0 | 1 < Bandwidth_FDD : bit (3) > } |
< Repeated UTRAN FDD Neighbour Cells struct > ::= — version of the protocol and shall not be used. |
< UTRAN TDD Description struct > ::= { 0 | 1 < Bandwidth_TDD : bit (3) > } |
< Repeated UTRAN TDD Neighbour Cells struct > ::= — version of the protocol and shall not be used. |
< GPRS REP PRIORITY Description struct > ::= < Number_Cells : bit(7) > { < REP_PRIORITY : bit > } * (val(Number_Cells)) ; |
< GPRS MEASUREMENT PARAMETERS Description struct > ::= 0 | 1 < MULTIBAND_REPORTING : bit (2) > } 0 | 1 < 900_REPORTING_OFFSET : bit (3) > 0 | 1 < 1800_REPORTING_OFFSET : bit (3) > 0 | 1 < 400_REPORTING_OFFSET : bit (3) > 0 | 1 < 1900_REPORTING_OFFSET : bit (3) > 0 | 1 < 850_REPORTING_OFFSET : bit (3) > |
< GPRS 3G MEASUREMENT PARAMETERS Description struct > ::= < Qsearch_P : bit (4) > < FDD_MULTIRAT_REPORTING : bit (2) > } 0 | 1 < FDD_REPORTING_OFFSET : bit (3) > 0 | 1 < TDD_MULTIRAT_REPORTING : bit (2) > } — TDD Parameters |
Table 11.2.4.2: PACKET CELL CHANGE ORDER information element details
PAGE_MODE (2 bit field) Global TFI TLLI (32 bit field) |
IMMEDIATE_REL (bit) 0 No immediate abort of operation in the old cell is required. ARFCN (10 bit field) BSIC (6 bit field) |
The NC_Measurement_Parameters struct contains the NETWORK_CONTROL_ORDER and the optional parameters NC_NON_DRX_PERIOD, NC_REPORTING_PERIOD_I, NC_REPORTING_PERIOD_T and the NC_FREQUENCY LIST. These parameters shall apply in the target cell (see sub-clause 5.6.1) |
NETWORK_CONTROL_ORDER (2 bit field) bit NC_NON_DRX_PERIOD (3 bit field) NC_FREQUENCY_LIST |
LSA Parameters |
ENH Measurement Parameters: For detailed element definitions see the Packet Measurement Order message |
3G Target Cell struct |
FDD_ARFCN (14 bit field) |
Scrambling Code (9 bit field) |
Diversity (1 bit field) |
Bandwidth_TDD (3 bit field) |
TDD_ARFCN (14 bit field) |
Cell Parameter (7 bit field) |
Sync Case (1 bit field) GPRS MEASUREMENT PARAMETERS Description GPRS 3G MEASUREMENT PARAMETERS Description |