4 Requirements

32.7613GPPEvolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP)Release 11RequirementsTelecommunication managementTS

The following general and high-level requirement applies for the present IRP:

  1. IRP-related requirements in 3GPP TS 32.101 [1].
  2. IRP-related requirements in 3GPP TS 32.102 [2].
  3. IRP-related requirements in 3GPP TS 32.600 [3].
  4. ANR management related requirements in 3GPP TS 32.511 [6]

In addition to the above, the following more specific requirements apply:

REQ-EUTRAN_NRM-CON-001: The NRM defined by this IRP shall contain E-UTRAN specific IOCs and related definitions, supporting E-UTRAN network entities.

REQ-EUTRAN_NRM-CON-002: The NRM defined by this IRP shall support management of inter-system handover between EPS and UMTS, between EPS and GSM, and between EPS and CDMA2000.

REQ-EUTRAN_NRM-CON-003: The NRM defined by this IRP shall support management of Inter-Radio Access Technology Automatic Neighbour Relation (IRAT ANR) from E-UTRAN to UTRAN, from E-UTRAN to GERAN, and from E-UTRAN to CDMA2000.

REQ-EUTRAN_NRM-CON-004: The NRM defined by this IRP shall support management of Intra-E-UTRAN handover.

REQ-EUTRAN_NRM-CON-005: The NRM defined by this IRP shall support management of Intra-E-UTRAN Automatic Neighbour Relation (ANR).

REQ-EUTRAN_NRM-CON-006: The NRM defined by this IRP shall support management of E-UTRAN relaying by having a Relay Node (RN) wirelessly connect to an Donor eNB (DeNB).

REQ-EUTRAN_NRM-CON-007: The NRM defined by this IRP shall support the management of designation of individual cells as reserved for special use, i.e. such that only UEs with an operator-specified subset of Access Classes 10 to 15 can use those cells.

Annex A (informative):
Change history

Change history

Date

TSG #

TSG Doc.

CR

Rev

Subject/Comment

Cat

Old

New

Dec 2008

SP-42

SP-080838

Submitted to SA#42 for Information and Approval

1.0.0

8.0.0

Sep 2009

SP-45

SP-090542

001

Addition of missing requirements for IRAT handover and ANR – alignment with stage2/3

F

8.0.0

8.1.0

Dec 2009

Update to Rel-9 version

8.1.0

9.0.0

Dec 2010

SP-50

SP-100833

002

Adding Relay and Donor eNodeB NRM Requirements – Align with RAN2 TS 36.300

B

9.0.0

10.0.0

Dec 2010

SP-50

SP-100833

003

Add requirement to restrict access to cells

B

9.0.0

10.0.0

2012-09

Update to Rel-11 version (MCC)

10.0.0

11.0.0

2012-12

SP-58

SP-120782

005

Correction on TS-family members in introduction

A

11.0.0

11.1.0