Skip to content
  • Tools
    • ARFCN-Frequency Converter
  • Contact Us
  • Foreword
  • Introduction
  • 1 Scope
  • 2 References
  • 3 Definitions of terms, symbols and abbreviations
  • 4 Concepts and Background
    • 4 Concepts and Background
    • 4.1 Intent concept
      • 4.1.1 Introduction
      • 4.1.2 Intent categorizes based on user types
      • 4.1.3 Intent expectations for different types of management needs
    • 4.2 Intent driven management
    • 4.3 Intent driven closed-loop
    • 4.4 Relation between rule, policy and intent
    • 4.5 General concept of Intent Content
  • 5 Specification Level Requirements
  • 6 Stage 2 definition for Intent Driven Management
    • 6 Stage 2 definition for Intent Driven Management
    • 6.1 Management operation for Intent (MnS component type A)
    • 6.2 Information model definition for Intent (MnS component typeB)
    • 6.3 Procedures for intent management
      • 6.3.1 Introduction
      • 6.3.2 Create an intent
      • 6.3.3 Modify an intent
      • 6.3.4 Delete an intent
      • 6.3.5 Query an intent
  • 7 Stage 3 definition for Intent Driven Management
  • Annex A (informative): PlantUML source code
  • Annex <B> (informative): Intent Life Cycle Management
  • Annex C (informative): Mapping the 3GPP and the TM Forum intentExpectation Models

6.3.1 Introduction

28.3123GPPIntent driven management services for mobile networksManagement and orchestrationTS

Tools: ARFCN - Frequency Conversion for 5G NR/LTE/UMTS/GSM

This clauses describes the procedures for intent management.

Editor’s Note: Capability of version handling of Intent need further discussion.