7 Control of IST

03.353GPPImmediate Service Termination (IST)Stage 2TS

Definition of the method used by a PLMN to decide which subscribers to use IST upon is outside the scope of the present document. However, it is likely that the decision will be made by some sort of FDS within the PLMN. The interface between the FDS and the PLMN node that sends the IST command to the VPLMN (the CAMEL server for a CAMEL implementation of IST) is outside the scope of the present document.

Annex A (informative):
Status of Technical Specification GSM 03.35

Status
of
Technical Specification GSM 03.35 (IST stage 2)

Date

Version

Comments

No Phase 1 version

April 1998

0.1.0

to SMG10 plenary, Lund, 6-9 April 1998 by the rapporteur

April 1998

0.2.0

output SMG10-WPB, Lund, 6-9 April 1998

June 1998

0.3.0

Minor editorial changes made by rapporteur

June 1998

1.0.0

specification to SMG#26 for information

July 1998

2.0.0

specification to SMG#27 for approval

October 1998

7.0.0

specification approved by SMG#27

October 2001

7.0.1

Editorial

Text and figures: WinWord 6.0
Stylesheet: etsiw_70.dot
Rapporteur: Tim Wright