Annex C (informative): Mapping the 3GPP and the TM Forum intentExpectation Models

28.3123GPPIntent driven management services for mobile networksManagement and orchestrationTS

The TM forum defines the structure of an intent as a list of expectations with each expectation containing the requirements goals and constraints to be achieved. The expectation is defined to contain 2 attributes – the imm:target and the imm:params. On the hand, the intentExpectation defined in 3GPP (see clause 6.2.1.2.2) contain more attributes some of which (the expectionObject, expectionObjectContexts, expectationTargets and expectationContexts)can be mapped to the TM Forum model.

Following the table to illustrate the attributes mapping between 3GPP Intent Expectation and TM Forum IntentExpectation

3GPP Intent Expectation

TM Forum Intent Expectation

Class Property

Attribute

expectionObject

imm:target

expectionObjectContexts

imm:params

expectationTargets

expectationContexts

Annex <X> (informative):
Change history

Change history

Date

Meeting

TDoc

CR

Rev

Cat

Subject/Comment

New version

2019-10

SA5#127

S5-196174

TS 28.312_000

0.0.0

2020-08

SA5#132e

S5-204460

S5-204461

S5-204462

1. pCR 28.312 Add scope

2. pCR 28.312 Add skeleton

3. pCR 28.312 Add concept and background

0.1.0

2020-11

SA5#134e

S5-206358

S5-206359

S5-206360

S5-206361

S5-206362

S5-206363

1.pCR TS 28312 Update Clause 4.1.3 Intent categorizes based on management scenario type

2. pCR TS 28312 Update Clause 4.1.1 Introduction

3. pCR TS 28312 Add relation of intent driven management and policy driven management

4. pCR TS 28312 Add use case and requirements for coverage optimization

5. pCR TS 28312 Add use case and requirements for RAN UE throughput optimization

6. pCR TS 28312 Add use case and requirements for radio network deployment.

0.2.0

2021-01

SA5#135e

S5-211221

1.pCR TS 28.312 Update the intent definition to align with concept

0.3.0

2021-03

SA5#136e

S5-212207

S5-212391

S5-212392

S5-212442

S5-212443

S5-212448

  1. pCR TS 28.312 Add concept for intent lifecycle management
  2. pCR TS 28.312 Add conceptual description for intent MnS
  3. pCR TS 28.312 Add stage 2 management operation for intent
  4. pCR TS 28.312 Add stage 2 procedure for intent management
  5. pCR TS 28.312 Add stage 2 information model definition for intent
  6. pCR 28.312 Requirement of Intent for service at edge

0.4.0

2021-05

SA5#137e

S5-213477

  1. pCR TS 28.312 Update Clause 4.2 and Clause 4.4

0.5.0

2021-10

SA5#139e

S5-215367

S5-215369

S5-215540

S5-215541

S5-215542

S5-215654

1. pCR TS 28.312 Add subsequence procedure after the intent MOI created

2. pCR TS 28.312 Add procedure of query an intent MOI

3. pCR TS 28.312 Update intent information model

4. pCR TS 28.312 Add concrete RadioNetworkExpectation

5. pCR TS 28.312 Update description in clause 4.2.1 andclause 4.2.2

6. pCR TS 28.312 Add definitions around Intent LCM

0.6.0

2021-11

SA5#140e

S5-216449

S5-216450

S5-216451

S5-216452

S5-216453

S5-216447

S5-216448

1. pCR TS 28.312 Update the concept of intent in clause 4.1.3

2. pCR TS 28.312 Update the use case description to align with intent definition

3. pCR TS 28.312Add concept of intent translation

4. pCR TS 28.312 Update intent life cycle management in Annex B.1

5. pCR TS 28.312 pCR TS 28.312 Add generic Intent management requirements

6. pCR TS 28.312 Description of Information Elements of an Intent

7. pCR TS 28.312 Extend Attributes of the Intent IOC

0.7.0