Annex C (informative): Mapping the 3GPP and the TM Forum intentExpectation Models
28.3123GPPIntent driven management services for mobile networksManagement and orchestrationTS
The TM forum defines the structure of an intent as a list of expectations with each expectation containing the requirements goals and constraints to be achieved. The expectation is defined to contain 2 attributes – the imm:target and the imm:params. On the hand, the intentExpectation defined in 3GPP (see clause 6.2.1.2.2) contain more attributes some of which (the expectionObject, expectionObjectContexts, expectationTargets and expectationContexts)can be mapped to the TM Forum model.
Following the table to illustrate the attributes mapping between 3GPP Intent Expectation and TM Forum IntentExpectation
3GPP Intent Expectation |
TM Forum Intent Expectation |
Class Property |
Attribute |
expectionObject |
imm:target |
expectionObjectContexts |
imm:params |
expectationTargets |
|
expectationContexts |
Annex <X> (informative):
Change history
Change history |
|||||||
Date |
Meeting |
TDoc |
CR |
Rev |
Cat |
Subject/Comment |
New version |
2019-10 |
SA5#127 |
S5-196174 |
TS 28.312_000 |
0.0.0 |
|||
2020-08 |
SA5#132e |
S5-204460 S5-204461 S5-204462 |
1. pCR 28.312 Add scope 2. pCR 28.312 Add skeleton 3. pCR 28.312 Add concept and background |
0.1.0 |
|||
2020-11 |
SA5#134e |
S5-206358 S5-206359 S5-206360 S5-206361 S5-206362 S5-206363 |
1.pCR TS 28312 Update Clause 4.1.3 Intent categorizes based on management scenario type 2. pCR TS 28312 Update Clause 4.1.1 Introduction 3. pCR TS 28312 Add relation of intent driven management and policy driven management 4. pCR TS 28312 Add use case and requirements for coverage optimization 5. pCR TS 28312 Add use case and requirements for RAN UE throughput optimization 6. pCR TS 28312 Add use case and requirements for radio network deployment. |
0.2.0 |
|||
2021-01 |
SA5#135e |
S5-211221 |
1.pCR TS 28.312 Update the intent definition to align with concept |
0.3.0 |
|||
2021-03 |
SA5#136e |
S5-212207 S5-212391 S5-212392 S5-212442 S5-212443 S5-212448 |
|
0.4.0 |
|||
2021-05 |
SA5#137e |
S5-213477 |
|
0.5.0 |
|||
2021-10 |
SA5#139e |
S5-215367 S5-215369 S5-215540 S5-215541 S5-215542 S5-215654 |
1. pCR TS 28.312 Add subsequence procedure after the intent MOI created 2. pCR TS 28.312 Add procedure of query an intent MOI 3. pCR TS 28.312 Update intent information model 4. pCR TS 28.312 Add concrete RadioNetworkExpectation 5. pCR TS 28.312 Update description in clause 4.2.1 andclause 4.2.2 6. pCR TS 28.312 Add definitions around Intent LCM |
0.6.0 |
|||
2021-11 |
SA5#140e |
S5-216449 S5-216450 S5-216451 S5-216452 S5-216453 S5-216447 S5-216448 |
1. pCR TS 28.312 Update the concept of intent in clause 4.1.3 2. pCR TS 28.312 Update the use case description to align with intent definition 3. pCR TS 28.312Add concept of intent translation 4. pCR TS 28.312 Update intent life cycle management in Annex B.1 5. pCR TS 28.312 pCR TS 28.312 Add generic Intent management requirements 6. pCR TS 28.312 Description of Information Elements of an Intent 7. pCR TS 28.312 Extend Attributes of the Intent IOC |
0.7.0 |